Marathon Digital is working on a large-scale mining operation in Abu Dhabi in a joint venture with a local development firm. The post Marathon Partners With Zero Two To Build BTC Mining Facilities in Abu Dhabi appeared first on Tokenist.
Marathon and Zero Two Working on Large-Scale Sustainable BTC Mining Operation
According to a Marathon Digital press release, the Bitcoin miner has partnered with an Abu Dhabi-based company called Zero Two to build large-scale mining facilities in the city. Zero Two, registered under the name FS Innovation, is an emerging development company focused on providing digital assets and blockchain infrastructure.
The first two locations are already under construction and will have a combined capacity of 250 megawatts. Zero Two will be the owner of 80% of the facilities and Marathon of 20%. The mined cryptocurrency will be distributed between the companies based on ownership.
Unlike most other sites which use air-cooling for their mining rigs, the Abu Dhabi location will utilize a custom-built immersion system to better meet the challenges posed by the local climate. Commenting on today’s joint venture, Marathon’s CEO stated he is hoping the project will help “build the next-generation Bitcoin mining facilities in Abu Dhabi.”
The Operation’s Impact On the Energy Grid
The facilities are designed to utilize Abu Dhabi’s surplus energy and help stabilize the city’s power grid. The operation is also designed to help with sustainability and will offset any non-green electricity produced with clean-energy certificates.
Do you think more cryptocurrency miners will seek to move to places like Abu Dhabi? Let us know in the comments below.